Building a custom home shouldn’t be a mystery. Below is the start-to-finish timeline we follow at Walnut Ridge Construction — clear stages, homeowner touchpoints, and what “done” looks like at each step.
We stake the site, verify benchmarks, lock the schedule, and hold a quick kickoff meeting so you know exactly what happens next.
Clearing, grading, erosion control, temporary utilities, and access. We preserve view corridors and drainage integrity from day one.
Footings, walls or slab, under-slab plumbing, moisture barriers, and inspections (where required). Cure times vary by weather and mix.
Floors, walls, roof structure, sheathing, and housewrap. Once the shell stands, you can feel the flow of the plan in real space.
After the roof is dried-in, we schedule your Electrical Walkthrough to place outlets, switches, lighting, exterior lights, low-voltage, and any smart-home rough-ins exactly where you want them. Tip: Bring notes for furniture placement — outlet and sconce locations will be perfect the first time.
Plumbing, electrical, and HVAC rough-ins route behind the walls. We verify all selections that drive heights and locations (e.g., shower valves, ovens, hoods, tubs).
Monroe County Note: Only state electrical rough/final inspections are required.
Thermal and sound insulation per plan. Optional upgrades (spray foam, extra sound batts) happen here.
Hang, tape, mud, sand, and texture if specified. It finally looks like a home.
Prime and first coats set the mood. We confirm color and sheen on walls, ceilings, and trim.
Interior doors, casings, baseboards, built-ins, mantels, and custom details. Craftsmanship shows here.
Cabinets are set, then we field-template countertops, fabricate, and install. Sinks, faucets, and appliance specs must match your selections.
Tile, hardwood/LVP, and carpet go in per room schedule. We protect high-traffic areas to keep finishes pristine.
We install lighting fixtures, devices, plumbing trim, door hardware, mirrors, and shower glass. Systems are started and tested.
Builder punch + trade callbacks. You’ll get a simple checklist; we handle the rest. Paint touch-ups and detail passes happen here.
Construction clean, then a final clean so your home is spotless for orientation and photos.
We walk every room together, demo systems, hand over keys and warranties, and set expectations for post-move support.
Contact the team at Walnut Ridge Construction today for a Free New Home Consultation today.
| Phase | Milestone / Scope | Typical Duration* | Homeowner Actions | Deliverables & Notes |
|---|---|---|---|---|
| Build Starts | Mobilization, site staking, schedule lock | ~1 week | Confirm communication cadence; verify selection approvals | Kickoff meeting; final plan set & permits on file |
| Site Prep | Clearing, grading, erosion control, utilities rough | 1–2 weeks | Approve any tree-saving or view-window adjustments | Pad ready; rough driveway access; silt & safety in place |
| Foundation | Footings, stem walls/crawl or slab, under-slab plumbing | 1–3 weeks (cure time varies) | Walk pad height & steps; confirm porch edges | Foundation complete; survey pins verified |
| Framing | Floors, walls, trusses/rafters, sheathing | 2–5 weeks | Walk rooms for any layout tweaks before rough-ins | Framed shell; windows/doors ready to order/install |
| Roof On (Dry-In) | Roof deck, underlayment, shingles/metal start | ~1 week | Schedule Electrical Walkthrough date | House protected from weather; interior rough-ins can begin |
| MEP Rough-Ins | Mechanical, Electrical, Plumbing lines & boxes | 1–3 weeks | Electrical Walkthrough: choose outlet/switch/lighting locations; low-voltage & exterior lighting points | Rough-in complete; ready for insulation |
| Inspections** | Jurisdictional checks (where required) | Varies by county | N/A | **Monroe County: State electrical rough & final only |
| Insulation | Walls/attic per spec; sound batts where planned | ~1 week | Confirm any optional sound-deadening locations | Thermal envelope ready for drywall |
| Drywall | Hang, tape, mud, sand, texture (if any) | 1–2 weeks | Approve texture and any feature walls | Walls/ceilings complete; ready for trim & paint |
| Paint | Prime, ceilings, walls, first coats | ~1 week | Confirm final interior colors & sheens | Color set; ready for finish carpentry |
| Trimming | Doors, casings, baseboards, built-ins, mantle | 1–2 weeks | Approve profiles & built-in details | Finish carpentry complete; ready for cabinets |
| Cabinets & Countertops | Set cabinets; field template; fabricate & install tops | 1–3 weeks (depends on slab lead-time) | Approve slab/edge; confirm sink & faucet models | Kitchens & baths take shape; ready for tile & plumbing trim |
| Flooring | Tile, hardwood/LVP, carpet install | 1–2 weeks | Confirm transitions & grout colors | Floors complete; protect high-wear areas |
| Lighting & Finishes | Light fixtures, switches, outlets, plumbing trim, hardware, mirrors, shower glass | 1–2 weeks | Provide any owner-supplied fixtures on site | Home functionally complete; systems on & tested |
| Punchout | Builder punch + trade callbacks | ~1 week | Submit punch list items (we’ll provide a checklist) | Defects addressed; paint touch-ups complete |
| Professional Cleaning | Construction clean, then final clean | 2–3 days | Walk home pre-orientation | Home showcase-ready for orientation |
| Final Walkthrough & Closeout | Owner orientation, systems demos, keys, warranty docs | ~1 day | Sign off; note any final touch-ups | Move-in ready; warranty kicks in |
| *Durations are typical ranges. Weather, selections, inspections, change orders, and supply lead-times can affect schedules. | ||||
Our available inventory changes frequently. Contact Walnut Ridge Construction to see current listings, schedule a showing, or learn about upcoming builds nearing completion.
“We interviewed several builders before choosing Walnut Ridge, but what sold us was their open-book pricing and constant communication. We saw every invoice and cost, and there were zero surprises. The process was honest and smooth from start to finish.”
Sarah & Mark L.

“From our very first meeting, we knew we were in good hands. Kenny and his team took the time to understand our needs, our land, and our budget. Our home fits our lot perfectly and turned out even better than we imagined.”
Tom & Rachel B.

“The craftsmanship is outstanding. Every trim line, cabinet, and stone detail feels intentional. It’s clear Walnut Ridge Construction takes pride in every home they build.”
Greg & Melissa K.

“We were building from Florida, and Kenny kept us updated with progress photos, budget reports, and quick responses. We never felt out of the loop, even from hundreds of miles away.”
David & Karen T.

“We’ve built before, and this was by far the best experience. The cost-plus contract gave us peace of mind, and the workmanship exceeded expectations. We would recommend Walnut Ridge to anyone building in Tennessee.”
Mark & Sheila R.

“I've had the pleasure of knowing the general contractor of Walnut Ridge Construction, Kenny Schmidt, for over 20 years. So, when it came time to build a house, there's only one person I trusted to take care of me. You'll never meet a more honest person in your life.”
David M. & Melanie W.

Typical range is 6–12 months, depending on design complexity, selections, inspections, weather, and site conditions.
During the Electrical Walkthrough (after dry-in) and at rough-in verifications. We confirm heights and locations before drywall.
Weather, long-lead materials, change orders, and county inspection availability.

East Tennessee’s trusted builder for custom homes, additions, and renovations crafted with care and a foundation of honesty, transparency, and integrity. Trust your home with Walnut Ridge Construction.
Contact Us
Walnut Ridge Construction
General Contractor
TN General Contractor Lic. #80735
1916 Highway 411
Vonore, TN 37885
Privacy Policy | Terms of Service
© Copyright Walnut Ridge Construction LLC 2025. All rights reserved